Our team’s proficiency in handling exploration services is further enhanced with Resource Modelling capacity through Resource Estimation & Mine Planning as per international reporting codes (JORC, 43N-101, SAMREC etc). These components are essential additions while escalating further towards assessing feasibility of the project.
Resource Modelling
Visualization of 3D ore bodies under the ground.
Recovery of sub-surface samples by drilling is most significant segment of asset development. Grade analysis of recovered samples hold clue to the potential economic viability of the deposit. However, it would be challenging to visualize distribution of the deposit without a perspective in 2D sections & 3D models of geology, structure, and mineralization. An efficient resource estimation paves way to tangible use of resource for development of mine; the same is addressed by experienced Resource Geologist whose acumen reflects on the effective use of Mine Planning software to create sections & plans. Capstone focuses on visualizing the deposit most efficiently with use of resource modelling software such as SURPAC, which enhances the capacity to visualize geological disposition as well as estimate grade wise resource distribution (geometallurgy) within the deposit.